Sunday, March 23, 2014

Warren Road, Cockeysville MD, Retaining Wall Project 7/2013


7/2013 Warren Road, Cockeysville Maryland, dry laid stone retaining / sitting wall 35' L x 25" H. Local stone from on site mixed with 1" Butler stone from Vinci Quarry. 


This project was on site of one of my favor jobs - a 7' high historic retaining wall with 10 floating steps. The best part is working with the homeowner John who truly understands and appreciates the craft. As you can see he has not only cleared out the site but set me up with packing stone (in the buckets). I'm not used to having a helper but this could grow on me really quick. Day 1


 

Most of the stone we had left over from the first project was alot of irregular shapes. After just clearing out the bottom layer of old stone foundation. I begin simply setting the stone right on earth. Normally I would do a protruding foundation with the stone set below grade. With this project I placed my first foundation stone right on grade. This irregular stone doesn't allow for a protruding foundation. 

Related Blog: How To - Foundation


You will also notice I don't have any frames or string lines set up. With this project I offered to the client an hourly rate. He wanted to have the remaining stone on the driveway used to build a 2' high retaining wall. Since the stone was more irregular - string lines would be extremely helpful. 

I wanted to let my hair down and test my natural instincts to help guide me. Building with out wall frames can be a challenge. Having the driveway was my guide to follow the shape of the wall. My eyes helped to keep the stones level. Those who are wallers understand that sometimes  you can easily get hung up on focusing to much on the stone instead of the project. What do I mean my letting my hair down? Just go with it. Pick up a stone place a stone - Not second guessing - just build a wall!! - don't focus on the little stuff. This will keep you from being a productive waller. 

You will see I'm using my wagon and the John has his handy lawn mower with his metal garden cart to move stone. YOU get creative with the equipment you have to help keep your back from to much wear and tear. As a one man show I'm all about equipment that ill help save my body from to much extra labor. 


As I'm getting to the top of the wall I have now set up a line in order to ensure I build to the same wall weight all the way down. 


 Just a little more stone to go! I love my wagon. Notice the pallets of stone stacked to the right. 


John would be sure to gather up some of the best stones from the pile standing them up on end so I can see at a quick glance what thickness I needed or shape. 

End of Day 1. 


Start of Day 2, I started setting the cap stones at the end closest to floating steps working in one direction. 


When me and John started we place as many of the larger stones at the bottom of the wall. I really love these three in this section. Building with large stone is the fastest way to gain height. As you will noticed I placed these stone out far enough from each other to be able to build with small stone around them. Had I placed them all next to each other - not only would it be hard to fill the voids with smaller stone - they would have visually looked out of place UNLESS all the stone in this wall was the same size. Now not only did I used these up first to get them into the wall but they took up alot of real estate making less work. 


When I had worked on the first wall project (wall to left) I made sure to repack all the stone in order of size and use. Just in case I needed them for the future project like this one - time well spent!!!


This was a great project for me to focus on speed, quality and not thinking about each and every stone I placed. Forcing me to trust my instincts. 


The wall has a rustic feel with the larger looser joints. The smaller 1" Bulter stone plates from Vinci Quarry helped as I placed my cap stones to get them to the level I needed. They also matched the first wall. The two projects built within a year and half from each other have a complementary similarity. If you look closely you will notice the wall to the left was built with all flat bedded stone - this project (to right) was more irregular or rubble stone with some flat bedded stone mixed in. 



John and his family do a lot of cooking - with this new retaining wall they can now walk out their door to thier edible garden (herbs, edible plants, flowers, fruits and vegetables.) 


Well done John and Family with all your plantings. 


Who's hungry now?


19 hours ( 2.5 days) total build time. Man that looks good!!!


I'm always amazed at the end of each job how a little stone transports an environment.  

Monday, February 17, 2014

Estate Entrance Way, Pillar - Wall, Proposal Drawling Specs


In my drawing I have shown the left side which would be the same as the right side - mirrored.  Both would have a slight curve to follow the current wooden fence line. Shown in mini sketch at lower right. 

I like to draw out my visions for proposals to help my clients have a clearer understanding of what services I'm offering.  When a client can see your vision they will understand what services you're offering. 

This skill set puts me above others who don't take the time to create value in their proposals. I only go to this level once I have a strong commitment and understanding. We are both on the same path.


Proposed space left side
The first two 8' sections of wood fence would be replaced with 6 foot high pillar and 4 foot high wall. This would be a total of 16 feet of fence removed and replaced with local natural stone. A dry laid stone construction - An Estate Entrance Way. 

Proposed space right side
I like to be a part of the space when planning a project in order to get a better sense of what will be a match to the landscape. I've seen way too many great jobs that just don't fit the landscape.

Have you ever driven down the road and seen a Home or a Hardscape that just looks out of place? You get that gut instinct that something isn't right. Having a BFA in Vision Communication Graphic Design I have a trained education in compositions and negative space. This is a skill set I bring to the table helping to allow me to create Start to Finished work with out a team.  Giving the highest level of quality to each job.


Other quality examples of Dry Laid Stone - Estate Entrance Way can be viewed on:  McAlister Stone - Lancaster KY



Friday, September 13, 2013

Merrymans Mill Road Arch / Wall Project Story - 2013



 I had the wonderful opportunity to write up quote as a sub contractor based off of drawings by Mark Willard & Associates LLC. At the time I had never meet or worked with Mark. After spending so much time looking over the drawling which included dry stack stone I knew I needed to meet Mark Willard. On September 04, 2011 I sent my first email explaining I had the pleasure to submit $$ on one of his plans. I was on a mission to meet the man behind the curtain. 

Mark reached out to me February 2012 suggesting he could block off half an hour to meet with me. I jumped at the opportunity. I took the laptop, books.... I couldn't wait to meet someone how was incorporating dry laid stone work in his plans. 

On February 17, 2012 we meet for the first time at his home office. The meeting went great. My favorite was when he showed me his photo library of images. On the first page 5 of the dry laid stone images were mine. I was starting to believe he might like my work. Even though he had never meet. 

Mark Willard & Associates work and office was extremely impressive. It was a joy to meet a professional who share as much passion and commitment to his trade as I do. I walked way with clear understanding of the value of hiring a Landscape Architect. Take a look for yourself to see what Mark Willard & Associates can do for you. www.mwa-us.com

Illustrations by Mark Jurus Copyright 2103

January 2013 Mark reached out expressing he had a small stone wall project he had in mind for spring. We meet and started our first communications on a joint design he had in his head. The concept was easy. Build a small wall from the road back with a water drain along with a column on the opposite side of the driveway to help connect visually to the wall. We began with the idea of a lintel as illustrated above with my sketch. Mark reviewed many of the stone samples such as Butler Maryland stone and Western Maryland stone. His vision was to have a stone which looked more like what is seen in New England.  A field stone allowing the wall to look as if it had been built 100 years ago. 


The start of a clean pallet. Ready for a stone wall and 4 sided column. 


Set up. Stall mats placed on grass to protect the lawn. Field stone from my farm gathered and sided dumped up the driveway for staging.


Rockin Walls Base Station set up. 1 work trailer with everything for the job start to finish. Dingo anchored to frame for security and Porta-Potti hidden around back of trailer. Since this is Mark Willard & Associates home office I try to be considerate of the space not to offend any of his clients as they drove up his driveway. 


The plan. You will notice the original sketch and conversation me and Mark started with was to build a lintel in the wall for the water to flow threw. I suggested changing this in order to build with field stone. The lintel would have required a long stone to bridge the top of the drain. The only solution to this would have been to purchase a PA blue stone tread. Which would have just made the stone stand out - looking out of place with others. The work involved to build the arch to me requires less time. Mark was 100% on board with my suggestion.


Setting and squaring up the wall frames to the white line on the side of the road. Wall Frames built with a 1:6 batter. 3' high wall on the road side coming back to 2' on the house side. That was level. I don't think I could have gotten any luckier on that calculation. 


Dig out and removal of all large drainage aggregate - Cockeysville RIP-RAP...along with river jacks Mark had placed in the bed. I dug out the bank in steps to allow the foundation stones be be stepped as I built up. I like to use maker plain to help me see my plan of action. A center line was placed down the middle for the drain pipe run off. This would also mark the center of the archway. 


String lines were set up on both sides to help me set my arch falsework. Since this is an active run off drain I had to consider how I should place the falsework. I was sure to start with building flat work (setting stones into the earth to create a flat bed) in order for the water to flow over and out of the drain threw the archway. Then I built my stone foundation. With the arch placement I was sure to have longer large stones which acted like a curb. Then I was able to elevate the falsework using small boards to level up side to side and front to back. But also staying between the string likes I set up. This upper picture has the falsework arch moved closer to the front string lines. The back shown below was pulled in away from the string lines - knowing that I will have to simply over hang my stones to keep to my wall shape. The back of the wall would not be something you will see later-Remember this!!.


The other reason this arch falsework looks familiar is that I have re used this from the pervious job. The likely hood of this is not common. Just so happens that the drainage pipe is 15". The falsework arch is 15" h x 30" a perfect solution to the drainage pipe.


In this photo you can see my flat work for the drain bed. The stones for the bed were set to go down hill in order to keep water flowing way from the drainage pipe. Of course you knew that but just incase you were... ok back to my story as I was saying....


First day of walling. Yippie!! Notice the stall mats placed to the right to help with staging of stone from the larger pile up the driveway. (back side of arch)


Front side of wall. This wall didn't take long for me to get into a rhythm with the field stone. This project came directly after the Round Hill Road Frederick - Arch. Going from flat bedding stone to field stone to build the arch was a welcome surprise for me which I couldn't wait to confront. 


I brought in some old barn foundation stones to help me out with my corners. Hard to find nice long 90 degree - corner stones unless they have been reclaimed from a local barn foundation.


The board on the frame makes the top of wall from the bottom side of the frame. 3 feet tall on the road side.


Working along side this road was no joy. I actually wear my reflective vest and set cones out for safety. Each day I wondered if someone was to busy texting that they my run off the road and hit me. 

This photos really shows nicely the my work site set up. As you can see again how I used the stall mats to keep the grass from growing between my rocks but also protecting the clients yard from stones dropped from the Toro Dingo's bucket. Straw and grass seed are put down once they mats are removed. 


This is my hill of stone. I'm not so lucky to have a great deal of 8"-16" stones. Mainly soft balls, or one man boulders. So picking threw these piles can take some time to find what will help me build. My Komatsu PC 27 mini excavator helps to loosen up the pile along with moving any of the larger boulders to the side with the thumb attachment. 


I then use my New Holland 665 skid loader to hand load all the stone to take over to my dump truck on the other side of our farm. Picking stone out of the woods can be a danger if you don't know what you might find under them. The only thing I found was the poison oak on my arm which took a week to heal. That was a real downer. 

I enjoyed think how this stone as sat untouched from the day it was placed here from someone such as a farmer. Now only to be moved to a new home and have a beautiful job for many passerbys on there way home from work each day. 


Then my 1992 Volvo FE with a Romanazzi 3 way dump challenging job site keeps the rocks flowing for the next stage in the game with the handy side dump. As long as it doesn't get stuck in the yard. 


Then the Toro Dingo TX 420 comes in to scoop them (me hand picking) off there feet (sitting on the stall mat) and moving them to there new home - a dry laid stone wall with a function.

Now you can appreciate just how much back end work goes into finding field stone and moving it to a job site. No easy task. Yes the time, labor, hauling, equipment... can add up to just as much as a pallet of stone from the local stone yard.



As I becoming close to the top of the wall I had to really thing about what to do about the caps. Mark had wanted flat cap stones with little to no over hang. The issue I was running into was SMALL stone and lots of it. 

Stone will always tells you what it wants to do if you listen. This stone was not large enough to allow for flat cap stones. I meet with Mark to talk about idea's. With the conversation going Mark came up with a wonderful solution on the spot. As seen above. So the next day while he was meeting with a client on the job site. I went to town building. 


See safety orange. I don't want to be mistaken for an ornamental grass with all those fast drivers coming down the road. 


I'm placing  8" vertical cap stones with larger flat stone set on the top of the wall called chicks & hens. I use a string line set level with a line level as seen in image. This keeps everything even at the top of the wall as I fit and shape the stones to the needed sizes. 


All finished up just have to remove the falsework. 


Mark and his partner were available to watch the final moment as I removed falsework from the all to see the new dry laid stone arch.


Many people look an dry laid stone arch wondering how this could really be structurally sound? I like to say crazy glue is amazing stuff....ha ha ha....Mark had the same thoughts I'm sure until I offered to walk on top of the wall. After I did so - the look on his face changed to sense of true confidence that this wasn't going to fall down any time soon. I did ask him if he wanted to walk on it before I did, but he did decline.


The back side of arch which will be filled in and act as a retaining wall. This will allow the wall to be connected to the driveway. A berm of sod will help keep the water flow heading out into the road. A drain pipe was installed to contact from the driveway pipe to the face of the wall.


Looking down the road.


Just a friendly reminder. Now you see it later you won't!! Blog to follow.


Top view of wall from house side looking at road. Double sided 8" vertical stones with 4 large flat cap stones.


I really enjoyed all the people who honked each day or yelled out how nice it looked as they  headed home from work each day. I'm sure all the landscape guys from the trade wondered what I was going to do with a pile of stone which no one works with. No one uses field stone in our area since it is not so common. The only choice they have are to buy palleted stone. One of the local landscape company designers had stopped one day to see what I was doing.  (of which I had attempted to relay my desire to meet with when I spoke with him on the phone a month earlier). He suggested I bring my resume and photo's to drop off for him to see. I had to scratch my head and wonder what the heck he was saying???? Or better yet  why I'm I wasting my time.... I just had to point out that I wasn't looking for a job - I just wanted to share my knowledge of the craft. I think he was wondering what the catch was the hole time - clearly those who read my blog know this = no catch. Just good old stone stories. 

Thank you Mark and Russ for giving me this opportunity to be apart of this amazing wall project. I feel extremely honored knowing you chose me for this project when you have countless connections. 

More blog's to come on this project:
- Arch way cover up
- 4 sided dry laid stone column
- Finished photos of job
- You tube of removal of arch

Stay tuned!