July 2024 Hanover PA, 24" Colonial Bluestone Seating wall with flat caps 19" with 2.5" overhang, 24" tall. 18' long with 2' corner bump out with 29.5" flat cap stone. Gravel patio w with curved walkway TrueGrid Pro Lite 1" deep filled with a /1/2" tan round pea gravel, 300 square feet. Built over and around the large tree in order to help protect the tree roots. Patio is a total of 18' x 12' with the walkway being 3'.5" wide. Truegrid is an affordable solution which keeps the gravel from shifting. Making it easy to set chairs, tables or roll a wheelbarrow over it.
Wednesday, July 24, 2024
6/2024 ~ Hanover PA Colonial Bluestone Seating Wall with Truegrid 300 sqft patio/walkway
July 2024 Hanover PA, 24" Colonial Bluestone Seating wall with flat caps 19" with 2.5" overhang, 24" tall. 18' long with 2' corner bump out with 29.5" flat cap stone. Gravel patio w with curved walkway TrueGrid Pro Lite 1" deep filled with a /1/2" tan round pea gravel, 300 square feet. Built over and around the large tree in order to help protect the tree roots. Patio is a total of 18' x 12' with the walkway being 3'.5" wide. Truegrid is an affordable solution which keeps the gravel from shifting. Making it easy to set chairs, tables or roll a wheelbarrow over it.
Monday, June 17, 2024
5/2024 Generator Pad Bluestone with TrueGrid Pro
Dry Laid Stone Wall Colonial Bluestone Generator Pad 9' x 16' back to grade 4' high including below grade base stones. Built solid front to back for the generator pad. Topped with Truegrid Pro Plus Gravel System filled with 1/2" Limestone. Flat cap stones 18" with overhang. Corners and cap stones cut from bluestone sheet stock, natural, saw & thermal plus feather and wedging used to produce needed sizes for this structure.
I started the dig out of organic material using me Ditch Witch SK850 Plus with a 52" bucket
I set the foundation stones below grade and protruding 4"
As you can see here I'm setting my corner stones every other. You can also see the foundtion below grade by the green turf.
This is my Oxygen and Propane torch setup for thermalling. Which works really well on the bluestone. It's a lot like sand blasting the stone.
In this photo I'm actually thermalling one of the cap stones on the wall.
Large rocks built to back and up at same time as building wall
Truegrid Pro Plus Set below cap stones level. Adjusting base and grid filled with #7 1/2" double washed angular Limestone.
Jumbo Salt & Pepper Cobble used for edging to meet up with the existing brick walkway.
Wednesday, June 5, 2024
6/2024 Custom Dry Laid Bluestone Steps for Front Porch
Hampstead MD June 2024, Custom Dry Laid Stone steps, 58" wide x 7" rise x 16" tread with 2" overhang, Replacing old boulder steps.
Low Voltage lighting added to post for lighting steps
Saturday, February 24, 2024
2/2024 White Hall Fire Pit Dry Laid Stone