ROCKIN WALLS

Pages

  • BLOG
  • Estimate / Service
  • Stone Projects
  • Historical Stone Projects
  • Gravel Path Patio - Driveways
  • About
  • Workshops Spring 2026
  • Landscape Lighting
  • Videos
  • Sponsors

Saturday, December 14, 2013

Merrysman Mill Road Finished 2013









Posted by Mark J at 11:07 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Dry laid stone column Mark Willard, field stone, Merrysman Mill Road Arch, Preatyboy field stone
Newer Posts Older Posts Home
Subscribe to: Comments (Atom)

Rockin Walls Blog

Mark • Dry-Laid Stone Construction "Dry Stack" • Certified DSWA Walling Instructor, Level 2 Journeyman Dry Stone Conservancy DSC - US & 3 Advanced - Dry Stone Walling Association DSWA GB • BFA - Visual Communication Graphic Design MICA – Maryland Institute College of Art. Walls built without mortar.

Quality not Quantity - One project at a time. to transform your dreams into a functional living space.


© Copyright 2020 Rockin Walls - Mark. All Rights Reserved - Content Images and Copy.

Featured Post

HPTC Project 2016 @ Hopewell Furnace National Historic Site

Understanding Proper Dry Laid Stone Techniques - Hopewell Furnace National Historic Site PA - HPTC  https://www.facebook.com/HPTC-Learning...

Popular Posts

  • Tool - Drill, Wedge & Shims
    Tool - Drill, Wedge & Shims I've wanted to learn something new. The time came to ask some serious questions. My stone buddy R...
  • Beechdale Road, Roland Park MD, Finished Project, Dry Laid Construction
    Dry laid construction, Butler stone with a mix of PA Blue stone along with local stone from the old wall. Left side retaining wall 3...
  • Tool - BIG Stone Rollers
    How does he move large stones with out fancy machinery? TJ Mora from Vermont  www.morastone.com  moves all his large stones the old fas...
  • Work Pants with Knee Pads SOLD IN USA: Armed Workwear, BLAKLADER, Caterpillar, Jobman, KneeGard, Mascot, Thrive Workwear, and Snickers
    I have looked high and low to find products that offer great knee pad systems. In my search I've found several great choice ...
  • Merrymount - Roland Park MD, Project Story, Dry Laid Retaining Wall 11/2012
    Merrymount Project Story. In the middle of 2012 I was contacted in regards to building a small 18" retaining wal...
  • DSWA Intermediate test-PASSED!
    Congratulations to me! I passed my Intermediate DSWA Dry Stone Walling Association (UK) timed test.   I was 1 of 8 to be the first to t...
  • Comments now open
    I have now opened comments to all. If you have tried in the past to post a comment you may have been declined. Now you won't be!  Unless...
  • How To - Set Flat Cap / Cope Stones
    Let me start by stating I'm no pro at what I do. I just enjoy sharing how I do it. My methods may not be considered correct or they...
  • 7/2015 Havre De Grace MD, Seating Wall, West Mountain w Colonial Blue Stone
    7/2015 Havre De Grace MD, Seating Wall, West Mountain w/ Colonial Blue Stone. A deck has been built inside this wall for an outdoor enter...
  • Consider this when hiring a Dry Stone Mason!
    If you plan on hiring a Dry Stone Mason, take the time to see their work. Understand what they do. How they have been trained. Do they hold...

Blog Archive

  • ►  2026 (1)
    • ►  February (1)
  • ►  2025 (1)
    • ►  February (1)
  • ►  2024 (4)
    • ►  July (1)
    • ►  June (2)
    • ►  February (1)
  • ►  2023 (2)
    • ►  December (1)
    • ►  September (1)
  • ►  2022 (2)
    • ►  May (1)
    • ►  January (1)
  • ►  2021 (2)
    • ►  August (1)
    • ►  July (1)
  • ►  2020 (19)
    • ►  December (1)
    • ►  November (1)
    • ►  October (1)
    • ►  September (1)
    • ►  August (1)
    • ►  June (11)
    • ►  March (2)
    • ►  January (1)
  • ►  2019 (13)
    • ►  December (1)
    • ►  September (1)
    • ►  August (2)
    • ►  July (1)
    • ►  May (2)
    • ►  March (2)
    • ►  February (1)
    • ►  January (3)
  • ►  2018 (7)
    • ►  September (1)
    • ►  August (1)
    • ►  July (1)
    • ►  June (1)
    • ►  April (2)
    • ►  February (1)
  • ►  2017 (12)
    • ►  December (1)
    • ►  October (2)
    • ►  July (2)
    • ►  June (2)
    • ►  April (1)
    • ►  March (2)
    • ►  January (2)
  • ►  2016 (16)
    • ►  December (1)
    • ►  November (3)
    • ►  October (1)
    • ►  September (1)
    • ►  August (2)
    • ►  July (2)
    • ►  June (1)
    • ►  May (1)
    • ►  February (3)
    • ►  January (1)
  • ►  2015 (16)
    • ►  December (1)
    • ►  November (3)
    • ►  October (1)
    • ►  July (2)
    • ►  June (1)
    • ►  May (1)
    • ►  March (2)
    • ►  February (2)
    • ►  January (3)
  • ►  2014 (29)
    • ►  December (4)
    • ►  November (2)
    • ►  October (5)
    • ►  September (1)
    • ►  August (3)
    • ►  July (2)
    • ►  June (1)
    • ►  May (4)
    • ►  April (2)
    • ►  March (2)
    • ►  February (2)
    • ►  January (1)
  • ▼  2013 (21)
    • ▼  December (1)
      • Merrysman Mill Road Finished 2013
    • ►  November (1)
    • ►  October (2)
    • ►  September (2)
    • ►  July (3)
    • ►  June (1)
    • ►  May (2)
    • ►  April (2)
    • ►  March (3)
    • ►  February (2)
    • ►  January (2)
  • ►  2012 (42)
    • ►  December (2)
    • ►  November (3)
    • ►  October (5)
    • ►  September (3)
    • ►  August (1)
    • ►  July (2)
    • ►  June (2)
    • ►  May (5)
    • ►  April (4)
    • ►  March (6)
    • ►  February (4)
    • ►  January (5)
  • ►  2011 (65)
    • ►  December (5)
    • ►  November (4)
    • ►  October (4)
    • ►  September (4)
    • ►  August (5)
    • ►  July (3)
    • ►  June (7)
    • ►  May (6)
    • ►  April (7)
    • ►  March (6)
    • ►  February (7)
    • ►  January (7)
  • ►  2010 (10)
    • ►  December (8)
    • ►  November (1)
    • ►  January (1)
  • ►  2009 (1)
    • ►  January (1)

Translate

Followers

Subscribe To Rockin Walls

Posts
Atom
Posts
All Comments
Atom
All Comments

Total Pageviews

© Copyright 2013 Rockin Walls - Mark Jurus. All Rights Reserved. Simple theme. Powered by Blogger.
  • Mark J
  • Meadow Creek Farm