Showing posts with label retaining wall. Show all posts
Showing posts with label retaining wall. Show all posts

Thursday, May 14, 2015

5/2015 West Mountain Stone 2'.5" H Retaining Wall, Wiseburg Road White Hall MD


5/2015 West Mountain Stone 2'.5" H x 52' L Retaining Wall, 4 steps, 1 cheekend.  Located on Wiseburg Road in White Hall MD. This was the first project of the season for me. Felt so good after a bad winter to get out and do some walling. The client for the project contacted me last year about a backyard makeover. They had contacted a LARGER landscape company in the area T?? which came up with a design for PA Fieldstone. Calling "DRY LAID" including drainage tiles, and mortar on the back side. WHAT PART OF THAT SOUNDS dry laid???????? I don't want to get off on a rampage about landscape companies sticking with landscaping not hardscapes. Sadly they (majority) give the Dry Laid Craft a bad rap when dry stack walls fall over in less than 5 years. The other part is that waller's like myself have to compete $$ which typically wallers end up being higher because we are building the walls properly. This means more stone which = more labor, hauling.... This project is made up of 130 Face Feet of wall = 19 tons of stone (each truck load was weighed) 38,000 pounds 
-:-  by 130 = 300 pounds of natural stone per Face Foot. 

Enough of that - on to the fun stuff. 



When I look at a space I ask myself 1) What do I like and what would I change? The first thing that I saw as a tunnel. Look at the before. Can you entertain in this backyard? No space - ZIPPO. 2) What colors would work best in the space is now the next questions. PA FIELDSTONE (dark brown, red, blue). Are you kidding me? No way. The house is brown and you need to open up the area. A nice tan color will complement the home and the garage to the left. Plus give the area a larger sense of space. 

The orange line as you may have noticed by now if you're still with me on this blog. This is the suggested new wall. Ya Ok you saw that in the first picture - sorry no surprising you any more with the content. I felt they had the room so let's move the wall back. Giving more space for the every evening of grilling. Man how often do you work all day just to have to smell the hot cooking of a grill at 5ish. I should have charged a pain and suffering fee. Yes of course they offered. But if I went home with a full belly my wife would be heartbroken we didn't spend a evening together for your dinner. 

The clients agreed my suggestions made great sense - go bigger, opening up the space for hanging out. Now they will be able to really use there backyard. What I haven't mentioned was the only reason they wanted a wall was because the old one was falling over. Nothing more.  I felt that if you're going to make an investment why not get more out of what you want.  I was able to offer them a larger space for entertaining with an updated proper built dry laid stone retaining wall. Yes your right it doesn't have any mortar on the back side. How cool is that? Free draining and flexible. 


I choose the West Mountain Stone which can be picked up at many of our stone yards in the PA/MD region. For the project I had a tri-axle of stone dumped at my farm then brought over a truck load at a time as needed. This stone comes from an area above Scranton PA. The stone as you can see has a very nice brown, full in colors and flat bedded (look like books). I enjoy working with on a November 2014 retaining wall project because the stone is hard but easy to shape if needed. The section to the left in the above photo is a 26" height. As the all moves past the steps in the middle it then jumps to 30". I worked alot on adjusting the grade for the client which complained about the amount of run off they would get. Sometimes coming into their home. After adjusting the earth I got to building the wall. More photos to come with this blog so check back next week to read and see more.



We talked about the placement of the steps which lead to the upper buildings. The window closest to you in this picture may one day be a door. So I was sure to give a nice compromise of walk flow from the front (side) door at the opposite end of this portion of the home and the window (future door).



When I build steps I like to place stones at top (some times) and bottom (always) in the grade for a couple reasons. 1) I feel offers what I call a welcome mat suggesting you travel this way. 2) Limits the growth of grass... also directing you to the steps visually. For the steps I used the largest stones I had available. Which can always be a challenge if you don't have what you need. You just have to make due and compromise. I was running out of large single stone for making each step as seen in the first lower two. To speed up the process I had one larger tread that just happened to me 6" thick and 6' long so I feather & wedged the stone into two. Giving me the top two steps. I had one last large stone that had been shipped down in my bulk load of stone. I brought it over and the homeowner loved it. So this is now the welcome stone set in earth at the bottom. As you can see this is a real doozy. 


I don't know these old concrete steps are starting to grow on me. Maybe I should go dig them back up where I buried them. I really can't figure out why someone felt it was a great idea to build with all this small stone for a wall. 80% of the stone I just disposed of onsite. What a waste but there was more mortar than stone I felt. To bad not being able to reuse materials onsite.


I will be sure to add some more to this blog first of next week. I'd also like to add that in the process of project I spent a great deal of time testing out all the PANTS WITH KNEE pads. Blog to come soon: http://www.rockinwalls.com/2014/12/blog-coming-soon-work-pants-with-knee.html

Thank you Steve & Flora

Sunday, August 31, 2014

10/2013 St John Road, Retaining Wall, Roland Park, Baltimore Maryland


10/2013 St John Road, Roland Park, Baltimore Maryland. 45' L x 28" H retaining walls same design as original. Built with old wall stone mixed with Butler Stone a little Laurel Mountain/PA Field stone mixed in. Wall has a 1:6 batter with protruding foundation and flat cap stones.


The start of the project always takes a little planning. The biggest issue on this job was the staging and handling of the all the material. I had to park in a alley to off load. Then us my dingo to haul every thing up the small trail with the dingo into the back yard. Seen below to left.



The space was completely over grown. I felt very claustrophobic in the space.


I did a job right next door to this home a year earlier "Beechdale Road Retaining Wall" and had stopped over a few times when I heard someone hitting stone. I found a gentleman working on building 2 other projects. He started this one I would be taking over.

This is all that was left after he walked off with not only a deposit but also the full payment. How could you not trust someone if you've already done 2 other projects with them? Well he never came back but to ask for more money after he already took a deposit and final payment. I'm always surprised how people like this can sleep at night. Its not that hard to simple treat others as you'd like to be treated. Last but least to always say "Thank You".


Knowing they had been clearly ripped off. I suggested time and material. This was the start of my new billing method. Everyone gets the fair end of the stick. No guessing no extra surprises...... win win for everyone. The main reason for me to take on the payment method was I didn't know how much material I had to work with or how long it would take to move new material on site and more importantly I wanted to be sure the client was being charged for only the work being done.

Notes: Remember before you dig you must call Miss Utility 811. It's the law!!

First steps removing all the old wall and clearing out the space. I made the suggestions to remove a great deal of the over grown plantings to help open the space. The client agreed and it was time to clean house!!.


This is the only other part of the wall that was original. I believe it had been rebuilt point. I know this because the building style is different then the first part of the wall. The wall was built level from one side to the other. So I stuck to the same design. I believe the wall might have been built dry but clearly was mortared over time.


In this photo you notice a old water feature with a cement pool. Built right in front of the wall. A pipe came out of the wall with running water to fill up the pool. Not sure where the extra water went. I'm also not sure what a pond this size would have had in it. But I guess it was a step above a bird bath. I'm thinking it was built in the 60-70's. The plan was to keep this and build my first small water fall. Using the cement formed pool with cracks with a new rubber liner. The wall would site back from this pool.


More stone coming in. 1 pallet means 4 smaller ones in order to move them off the truck and up the hill. Thank god for my little Ride on plat form my buddy Mark built for me.


Next it was time to build the foundation. Having more then enough stone to choose from helps stop my feeling "I'm using the best stone in the foundation". Kind of a mind game I have to fight every time I build a wall. I hate to bury good walling stone. A strong foundation makes for a strong lasting wall.


This is the staging area. All my pallets set off to the side so I could grab them when I needed them. The blue tarp covers the pile of dirt I moved out but would need to put back later once the wall is finished.


Foundation all set. Two walls using large stone on the out side and in the inside. Packing in the middle. Remember length in for strength. 

Related Blog: How-To-Foundation


Wall frames set - build time! Two PVC pipes set into the wall to run a water lines the other electric.


I can't say it was very easy working around this cement pool. Luckily I never made a wrong step.

This photo helps show the front wall and back wall being built. You can also see how I stage my pallets closer to pick off of when I'm working. The staging of a job site can be the hardest thing to learn. For example where I'll put the dirt so its not to far way when I need to put it back. Or where I place my pallets so I don't move them more then once until they are empty.

Time is everything. Being smart about how you use it is key!



Flat Caps start to go up.




Yes more stone.


I cut out a PA blue stone in order to attempt to make a water fall. But the water running back was an issue. Even if I had a liner I ran the cancel of under minding the wall along with the loss of water. So I felt it was better to scrap the idea and come up with something else. Clearly this one wasn't working very well. It was a nice thought.


Once I got the other end finished up I started capping the other side so I would be able to meet in the middle. Notice my handy brick with the string line wrapped up.  As I move forward I wrap it around the brick and set it on the next stone. As I get closer to both stones coming together I'll then use a long level to ensure I'm on track. Bubbles never lie.

I know this is natural stone but one should never use this as an excuse as to why the work shouldn't be perfect. That is perfect? A proper built wall using should always follow Basic Principles and Rules

Related Blog/Video: Dry Stone Principles




Finished Wall!!



New fill dirt being placed back behind wall.


I changed the hill grade to give a smoother flow to the space and wall. Four years at one of the best Art Colleges (MICA) in the USA, I learned skills that other masons can't begin to bring to the table. Color theory, negative space, compositions, focal points to name a few. 




I had to build a few lintels over drain pipes and a gas line. Above I placed two loose stones to hide the hole. As seen below both removed.



You can see the grade change in this photo. I took the hump down in the middle where it was high to smooth it out. Now visually as you look up the hill you see the home.




Wall was now done. Time to get working on what to do with the water feature. I contacted Maryland Aquatics. Who got me all set up with everything I would need to make this into something new.


I stated out with the water fall box setting it so the sound would travel up the hill and too the home. The clients kitchen over looks this space so they can enjoy the sound of the water fall.


Then I put down the felt -

 and liner.

Next comes the piping and pump. I added a extra relieve value at the pump end to act like a volume dial if the water pressure was to much at the water fall box. By doing so allows the opening of the valve to reduce the water flow out of the water fall box.


This was a nice score. A 3 in 1 cement, primer and cement spray PVC piping. No more mess or wasted cans of product after sitting for a month. I picked this up at Home Depot PipeWeld. One of the best products I've used to date. But nothing compares to PEX piping.



I also placed a valve on the water fall box with the ability to hook up a garden hose. This would help for clean outs. A simple system to allow for basic maintenance needed yearly.


Then it was TEST TIME!


DOG APPROVED!!!

My client told me his dog didn't like water. Funny how he just jumped right in. I set flat cap stones to hide the liner. This might not be as organic but it fit the bill and solved the need to hide the cement pool and liner.


Of course the weather was great for the full build then the last day I was busy playing in a mud puddle. Not to glamorous but it sure felt great to have finished up another wall for a very happy client. I finished things up with a few plantings I had from my home. Some hosta's, ground cover, and grasses to help finish up the space.



Last but least straw and grass seed to finish up the job.


Staging area was all cleaned up.


One wall and one water fall = Two very happy clients and one happy dog.

If you made it threw another length blog. Thank you. This is clearly the longest to date. I feel content is king and photos don't lie. When I see finished photos of projects I always wonder - How did they do that? Photos, copy, and water marks do take a lot of my time. If I can help one person to understand proper dry stone methods - this time was well spent.

Thank you for your time!