Beechdale Road, Dry Stone Project Story 8/2012

Finished construction September 2012

First of the year 2012 I was contacted by Diane and Gail in Roland Park MD. They had a large 100 year old Beech tree which had up rooted their old steps. As seen below. The tree just lifted the wall and steps right up out of the earth. 


Taking the time to do my homework - my biggest concerns was the existing carport structure. After contacting many of my stone experts along with other experts in construction. I got the thumbs up. If any damage was done it would have already be showing. 


The build would replace just about everything the way it was with a few changes. 1) move the wall out  away from carport. 2) larger steps both in length and with a smaller easier step. ( the old wall had 7 steps 2' wide with a 7" rise = height of each step) New steps will be a total of 8 with a 6"rise and 14" tread. Build the wall with out mortar. 

The owner had spent a great deal of time reaching there options and found me from the web. 

The replaced structure used Butler stone with PA Blue stone and steps. All old the stone was then put back into the new build.


I started gather all my stone. First the PA Blue stone slabs to make into the steps using feather and wedges. Notice my supervisor sitting on the job? (on the fork lift) Can't find any good help these days

Related Blogs:

How To - Wedge and Feathers Voodoo Magic



I was able to make 8 steps ranging from 4' - 6' long with slabs ranging from 3"-5" thick. The benefit of the 3"-5" allowed for me to help build my steps up to 6" as needed. As seen later. 


All stone was gathered taken to the jobsite, stacked and protected by safety cones. The best part of this build was the ability to stock pile all the material on site. Most homes in Roland Park don't have any driveway. The down side to the job was working over a bank with out any way to get any of my equipment to the lower section. 


Once all the material was on site I set off to start removing the old wall. The protruding wall with steps was mortared. The jack hammer was pulled out to solve this problem. The section by the carport surprisingly was all dry laid. What you might not be able to see unless you really look - notice the YELLOW FLAGS coming up to the retaining wall. GAS LINE - yes of course as you know this is where I tell you "Call be for you Dig" 811 miss utility. If this section of wall was built with mortar I might have been a little stressed out if I had to use the jack hammer any where close to that section of wall. Good news being dry laid - I just had to lift each stone up with my hands move them to existing piles and keep going. 


 

With all my old wall stone I set up 2 piles. The one to the left would be away from the free standing wall but close. The other pile I set on a plastic mat to keep the plants from taking over as I was building. The key was to have the piles close but not to close to be in the middle of my rebuild. You want your material to be close if you plan to reuse it. You do not want it in your walk path or your build area. If you have to move it more then twice your wasting time.


I set string lines up to help give me a guide in order to see my build. Check and double check to make sure I was on target. Now would be the time to change any plans. Notice safety first - plastic caps on rebar. You will also see I have not started to rip out the retaining wall yet! Next photo shows all the stone taken out. The stone left I would build around.


Next I started building my protruding foundation. I started in the bottom center and over in the corner by the column. 


This image above really helps to show the stepped foundation. You can also see the stone from the old wall off to the side out of the way but close at hand when I need them for the rebuild. I feel that each and every stone that comes out of the old wall should go back into the new one. 

Blue marker paint just helps me make sure I'm on target with my plans for the structures. Having a visual helps me see the bigger picture at times. 



This image shows me building my frames. I used soap stone to make marks on the ground. Then the square helps me determine at what height I need to come in "x" inches at the top to have the correct batter. (this wall was built with a 1:6 batter) I might be a little over the top but I prefer to work to the fullest level of accuracy natural stone or not. One job I was on the landscape contractor kept saying its natural stone. It might be natural but that doesn't give you a license to do work at subpar levels of the craft?! And these people have work and are taking you hard earned cash to leave you with something many skilled craftsmen will be fixing in no time. SAD and frustrating that home owners don't know any better - in order to spot crappy work. 

Now I'm setting up my frames off the garage uprights. I'm using this carport to square off from. I set my frames closest to the building. Then I set string lines to measure out from. You will also notice the 3/4/5 square to square up and set my markings for the next group of frames. The zip level helps me determine were my first steps will need to sit. I'm checking right now with the zip level how far below my master line I'm at. 

Related blogs:
Tool - 3' x 4' x 5' / 90° Folding Layout A Square

Challenges of setting frames can be when you have to keep them all in line. The other is when you need to put frames at a upper levels - then the angles change (notice smallest frame to far right). It might be a little hard to see but by the driveway this wood frame that goes horizontal is my MASTER mark. This is where the top step will go to match the driveway.

Some of my wood frames I keep open on the inside. Such as the frames to the left for the retaining wall I don't need a inside frame like those on the right for the freestanding wall. Since the frames are all based off the same 1:6 batter the only thing I need to do in order to set them up is set a level on the top to set the frame at the correct angle.

The down side with so many frames are you can easily get lost in them, you can't see our build as well and your bound to trip over one or two at some point. I use rebar to keep them in place. Some I build with legs out and set stones on them. The 3rd frame to the right (on retaining wall) in would be such an example. If you blow the photo up you will see this. Images below also show  a better angle.



I spent 2 days building my frames along with setting them. I wanted to be 100% on target with my build any error now could cost me a complete rebuild. Yup that's right I don't want to move the stone more then twice.


Once I determined how far I was below my master line for example 54" below. I then was able to start my build for my first step. When I started building my wall I started at the back garage pole then around to the spot for the first step. Everything depends on the correct placement of the first step. The will set the full build in motion. If this is off the project is bust!!

I begin to build up with small stone for under the PA Blue Stone step. With the first step it must be in the correct place. If this stone is not in the right place the hole build could be compromised since this step sets the stage for the build. 


I used my new/used mini excavator with a new Geith Thumb to set my stones. After last year building the Warren Road wall with floating steps I realized how much this machine would do the work of 4 men and then some. With just me operating it. Setting large steps, stones or excavating a the job site. First step will be 3' long with the 8th (top) step 4' and act as a platform.


Second step into the wall. Now I begin to build up the out side free standing wall. With this build I build backwards with each upper step. (headed towards the driveway)


The start of the cheek end /wall head at end of free standing wall.


3rd step now in place. I build back level behind each step as I place them. Then I build up once again to get the desired rise (height) which is 6". My tread (width) is 14" 


Little by little I make it to the top of the build. You can now see the Master line ie the horizontal wood board by the driveway. This marks the top of wall at last step, level to driveway.


Notice left side wall - retaining wall corner with inter locking stones like dovetail construction in wood work such as furniture ( look in side of any good drawer). Or like taking your two hands and inter locking your fingers. Makes for a very tight lock. I continue to build up on the full project but mainly the steps. One at a time.


5th step up.


6th step up.



One day when I was working in the rain I realized the rain was coming right into my wall. (best thing about working with dry laid stone-can't do that with mortar!) One thing I had never looked at was up. I didn't realize that no gutter was on the carport. Don't know why I didn't think of this. I believe I was so focused on the integrity of the structure as I took the old wall out. I never gave a thought. 

 

Easy fix - make a rain gutter on the back side of the wall. (more water you can keep away the longer the life of the structure) The carport can't have a rain gutter installed due to the slate roof and small flashing. I re-use the old stone that was inside the carport before. 12"x12" PA Blue stone squares. I was sure to pitch the stones down, add a few steps in the flow and make sure the last stone over hangs a little past the wall. Keeping the flow going out and away. This part of the build was not planned nor did I bill for the change order. It was simply a matter of - 

Why not? Because I can! 


Rain gutter being built. I used small Butler stone as the edging closest to the car port.


I begin to put the cap stones on. You can see at the end of the rain gutter the cap goes over. I use PA Blue stone to loosely finish off the back side with the cap stones by the gutter. The cap stones at the outer upright pillar are -10" below the Master line. I build my caps level all the way around to steps. The free standing wall also has one level cap. After the level caps on both sides of the wall they head up hill toward the driveway.


1 Potato 2 potato 3 potato - sorry just caps stones one by one I work to the sting line to make sure they are headed up hill in the same directions. You'll notice the wall on the far side is not built all the way up. The reason for this is as I work back I can find the stones I need to get to the needed height to set my caps at the correct level and angle.

Remembering you still need to build level as you go up hill. Only stepping the stones to get the angle you need. Tricky tricky tricky. But saving all those small flat stones will now come in handy. 


Looking out from the carport



7th step now goes in. I will now have to remove all my frames to finish the build. I have enough of the wall built to know where my I need to go. I will have to finish the last part of the build all with my eyes and believe in my instincts.

I find it easy some times to fall into the trap of relying on tools like a tape measure to second guess my brain. When you take the time to believe in yourself and follow your nose - I mean your brain you will find the answer quicker then you may have walking around with the tape measure. But this is very difficult for two reasons. Trusting yourself instincts and turning off your brain. As I call it letting my hair down. Go with the flow. Ya good luck with that one!



Last step goes into place. 


Finished wall with rain gutter. You'll notice the top of the cap stones come into the top step. This will keep any one pushing snow with snow plow from pushing the cap stones off the wall. They will have to take out the top step to take out the wall. But hey if that happens - I know a great waller!  Since the wall is dry laid stone I can put them all back with out any problems. Might just take a little time remember where each one goes. Good thing I numbered each stone. I love walling by numbers. 


I replaced all the small stones the home owner used to use to step out of their car. With a 5'.4"x20" PA Blue Stone tread / second. The stone had a small chip so I saved the home owner a considerable amount of $$.  The stone due to the size was only set on earth and set parallel to the carport blacktop. Now the chances of weeds coming back are minimized by such a large stone. I had to bring this to the job site in the back of my Kia Soul. When my truck was out of commission.

Related Blog: 





 


Finished Blog Photo's:

Beechdale Road, Roland Park MD, Finished Project, Dry Laid Construction

Thank you for taking the time to follow my blog and my joy for stone walling. If you made it this far you've read the longest blog to date.

Saturday, October 6, 2012

Beechdale Road, Roland Park MD, Finished Project, Dry Laid Construction



Dry laid construction, Butler stone with a mix of PA Blue stone along with local stone from the old wall. Left side retaining wall 3'.5" corner length with a 19'.5" length back to driveway. 8 PA Blue step stones built into both walls. Free standing wall 11' with vertical cheek end. All walls built with a 1:6 Batter. Average height of the walls are 3'. Two tie stones 3' in from corner before steps. Walling style corse with random jumpers. Project time 34 days


The original mortared wall/7 steps were replace with the same design but modified to be much more practical to the space. This old wall was damaged when a 100 year old Beech tree fell over lifting the wall/steps right up. 


After weed wacking my work area you can now really see the old wall. The steps were built with mortar the old retain wall was built dry. Which was great since a gas line was directly under the structure. Had this been build wet I would have been a little concerned using any gas or power tools to remove such a wall. 


Most of the wall shown in this photo would be covered later with screened fill dirt. You can really see the over all size along with much of the all which will soon be hidden. Cap stones can be best seen in this photo with the angle going up hill to hit top step. My thinking was being a driveway if snow plowed snow would only be push over and down the steps. Since the last cap stones hit the middle of the top step. No Snow being plowed or the plow would catch them. The only possibility would be the top step being moved. 


Before photo from back yard. You can really see how the force of a 100 year old beech tree just up rooted these mortared wall/steps. 


14" + Flat caps on corner to steps. One flat cap on wall head / Cheek end.


8 PA Blue stone steps feather and wedged. Bottom step #1 being 3' wide with the driveway step # 8 being 4' wide but really making a full landing with the stone total length of 80" seen below. Steps have 6" rise (height) with a 14" tread = very comfortable to walk up or down. The steps extend 112" out. 


This photo looking down the steps really shows the left cap stones. The freestanding wall cap stones are 15". You will also noticed in the photo the rain gutter behind the retaining wall. After heavy rain fall I realized that the car port did not have one. Not something I had noticed before. Installing one on the structure would have cost big B$$$k's with the slate roof and no facing to install one. So I figure why not. This was a home owner bonus why because I can. Plus I really felt this one little thing would be a game changer long term with the longevity of the wall. Helping to remove water away from a wall is always a good thing. This part of the project was inspired by the local street drains. Blog: Calade - Dry Laid Road Gutters. Behind the rain gutter (to right) you will notice a PA Blue stone step 5' long by 20" wide. The home owner wanted something other the dirt to step on when they opened there door. The large the stone less chance for weeds to grow under their feet.


With the drain I was sure to have one large stone over hang past the wall in order direct the water out past the wall.


Screened fill dirt, grass seed and straw put down. Most of the new wall now hidden. You can also see the benefit of having a large flat step which matches the driveway when the car door opens. The client can step out onto something safe. 


Full wall. I replanted to hostas from the property to help add a little color and height back to the space. In time grass will be sprouting up. The green grass will really make the brown stones pop. 


Cheek end with steps.


Freestanding wall from inside.


Retaining wall from inside with steps.


Corner of wall with flat cap stones and tie stones.


A great view from the backyard. I believe each dry laid construction I design and build should fit the space. Otherwise I'm not doing justice to the stone's, myself and the client. This home was built a 100 years ago with craftsmen who took pride in there trade. 

Hire a craftsmen for your next job.

Thursday, September 27, 2012

StoneWURX YOUTUBE 9/28-30th Festival

This video was shot with the new GOPRO 2 HD in Hanover Ontario Canada. Wallers from Canada, Great Britain and the USA have come together to help build this amazing structure. A one of a kind. Come take a road trip and see it for yourself.



StoneWURX Festival Sept 2012


StoneWURX Festival Sept 28th 29th 30th 2012
Hosted by Ground Effects Landscapes Hanover Ontario Canada


Andrew Loudon And Dean McLellan (Host or the Stone WURX event)  Front of Stable Building.


Inside, left to right Bill Noble (Master) Stephen Harrison (Master) Philip Dolphin (Master) outside wall.


My first night (Tuesday) on the site, and they made all of us steak dinner, salad and fresh apple, pancake and one other pie I never saw (it went so fast)

Then Bill and his family sang some songs

Lydia Noble You Tube

Bill and Curthbert You Tube


Front of building


Wednesday Next day lunch fit for a king!


Yummy - of course my plate. Those who know me know I love food. Yes I went back for seconds. Lasagna, salad and buns.


Philip Dolphin working on back section of wall. Philip has been working this section on both sides. Amazing speed. 


Tracey Blackwell (Advanced soon to be Master) working on left both inside and out. Andrew Loudon (Master) working on Right side. Brian Fairfield's hiding behind Loudon's section on the inside.


The gang in front of a dry laid stone cottage Dean (our host / in charge of the build)
 More to come. Thank you to my wife who has taking on my chores at our farm to allow me to attend this once in a life time opportunity with some of the best of Dry Laid Stone Masons of our time. I couldn't further my eduction with out such a supportive partner.

Please take a moment to see the farm blog she writes. Many thanks to her for incuraging me to start this blog and coming up with the name.

Meadow Creek Farm Blog

Copyright 2012 Mark Jurus, Rockin Walls. 

Thursday, September 20, 2012

Tool - Wagon, 1200 pound rated


The current job I'm now on had some logistical challenges. The biggest issue were to storage material on the job site (stone has to be hauled in one dump truck load at time) the second the moving of the material for this 70' long wall. I had never owned a wagon like this but I figured the foot print it would leave on the landscape would be one of the smallest. I own a wheel barrow but I've never used it for walling. 

  
You can find these just about any were. I picked up mine from my local Tractor Supply Store for about $110. With an investment like this I had nothing to lose if it can help save my back and a little more time. What I like about this wagon over a wheel barrow. I can see all my stones very well and work right off the platform. I can even put down one or all the walls making it even easier to grab stones. This wagon has a great turning radius and will not fall over if you make to tight of a turn since it has a wide wheel base. 


This wagon had a rating of 1200 pounds. The first thing I did was to cut some plywood to protect the bed made out of steel mesh. Ya that would not have lasted to long with some rip rap stones. Now I can just throw them in. Well kind of......

So far I've moved over 12,000 pounds of stone - I'd say this was well worth the investment. Really not to bad to pull around either.